Alberta drivers may experience delays Friday due to a supersized load hitting the road between Tofield and Fort Saskatchewan. The C2 splitter, used in industrial distillation, is 135.2 metres long (443 feet) and weighs a whopping 1,157 tonnes. At 9.4 metres and 9.5 metres tall, the load will travel on 640 wheels and take up the entire highway and shoulder, travelling at a maximum speed of 50 km/hr. The splitter and its guide vehicles will take the following route starting at 4:30 a.m. Friday: The load is anticipated to arrive at around 2 p.m. Up-to-date information on Alberta roads can be found on the 511 website.