Edmonton

Heavy rainfall, slope instability closes High Level Bridge sidewalk

Published: 

The east sidewalk of the High Level Bridge was closed as of June 25, 2026 after heavy rain created unsafe pedestrian conditions. (Galen McDougall/CTV News Edmonton)