Repair coming for Greater Victoria sewage treatment plant, CRD says
It cost $775 million to build and took five years to complete. It’s the CRD’s sewage treatment plant, and so far, it’s not functioning as it should.
“One has to wonder what we got for $800 million,” said Hugh Stephens, vice chair of the Mount Work Coalition.
The plant was touted as the CRD’s sewage solution. Instead of pumping treated waste into the ocean, the region’s sewage would be turned into tiny pellets and sent to the Lafarge cement plant in Richmond, to be burned as an alternative to coal.
“Apparently, the anaerobic digester’s not working; the dryer’s not working,” said Stephens.
Right now, the pellets don’t meet Lafarge’s specifications, as they are not the right size, so the CRD had to do something with the biosolids the plant was producing.
“Right now, it’s just being dug in trenches and put into the landfill,” said Stephens.
Neighbours of the facility at Hartland Landfill have concerns about that.
“If there’s anything that goes wrong, Todd Creek is done, Saanich Inlet is done,” said Stephens. “You know, there have been issues in the past with leachate coming out.”
Mike Hicks sits on the CRD board. He admits there are issues with the plant.
“You know, all my life I’ve had engines, outboards,” said Hicks. “I’ve built fishing lodges, and once in a while I just got a lemon and no matter what I did to it, I just couldn’t get it to work. I really hope this isn’t one of those lemons.”
He’s confident that a fix will come, but in the meantime he feels for the people living and visiting the area around Hartland Landfill.
“The poor people of Willis Point are enduring this terrible stench as they do this, and hikers,” said Hicks. “It’s not good and it can only get better.”
The CRD says a fix is on it’s way.
Glenn Harris, senior manager of the CRD’s Environmental Protection Division, describes the issue as a mechanical one.
“We’re simply going to get a sieve in place where we can actually make sure that we can shake through the pellets and get them down to a size that Lafarge, the cement facility, can handle,” Harris said. “That’s a mechanical solution and we have that on order and we expect that to be in place in the next few weeks.”
Because of the project agreement, it won’t cost taxpayers any more money.
“(The contractors who did the work are) obligated and they have the liability to resolve the issues with the plant,” said Harris. “So they have an incentive to fix this as soon as possible.”
The CRD is hoping to have the problem resolved and to begin shipping bio-solids to Richmond this summer.
CTVNews.ca Top Stories
'A beautiful soul': Funeral held for baby boy killed in wrong-way crash on Highway 401
A funeral was held on Wednesday for a three-month-old boy who died after being involved in a wrong-way crash on Highway 401 in Whitby last week.
'Sophisticated' cyberattacks detected on B.C. government networks, premier says
There has been a "sophisticated" cybersecurity breach detected on B.C. government networks, Premier David Eby confirmed Wednesday evening.
Police handcuff man trying to enter Drake's Toronto mansion
Toronto police say a man was taken into custody outside Drake's Bridle Path mansion Wednesday afternoon after he tried to gain access to the residence.
Biden says he will stop sending bombs and artillery shells to Israel if they launch major invasion of Rafah
U.S. President Joe Biden said for the first time Wednesday he would halt shipments of American weapons to Israel, which he acknowledged have been used to kill civilians in Gaza, if Prime Minister Benjamin Netanyahu orders a major invasion of the city of Rafah.
Rookie goalie Arturs Silovs to start for Canucks in Game 1 vs. Oilers
Rookie goalie Arturs Silovs will start in net for the Canucks as Vancouver kicks off a second-round series against the Edmonton Oilers Wednesday night.
Nijjar murder suspect says he had Canadian study permit in immigration firm's video
One of the Indian nationals accused of murdering British Columbia Sikh activist Hardeep Singh Nijjar says in a social media video that he received a Canadian study permit with the help of an Indian immigration consultancy.
Pfizer agrees to settle more than 10K lawsuits over Zantac cancer risk: Bloomberg News
Pfizer has agreed to settle more than 10,000 lawsuits about cancer risks related to the now discontinued heartburn drug Zantac, Bloomberg News reported on Wednesday, citing people familiar with the deal.
Quebec premier defends new museum on Quebecois nation after Indigenous criticism
Quebec Premier Francois Legault is defending his comments about a new history museum after he was accused by a prominent First Nations group of trying to erase their history.
U.S. presidential candidate RFK Jr. had a brain worm, has recovered, campaign says
Independent U.S. presidential candidate Robert F. Kennedy Jr. had a parasite in his brain more than a decade ago, but has fully recovered, his campaign said, after the New York Times reported about the ailment.