B.C. to help build new $89.6M engineering buildings at UVic
Two cutting-edge STEM (science, technology, engineering and math) facilities will soon begin construction at the University of Victoria, with funding from the B.C. government.
The $89.6-million project includes the construction of a six-storey engineering and computer science building, and an adjacent "high bay research and structures lab."
The new engineering and computer science building will include a new laboratory and teaching spaces that can accommodate 500 additional seats, according to the province.
The expansion will lead to 125 more graduates from six engineering programs and UVic's computer science program by 2023, the province announced Wednesday.
Meanwhile, the high bay research and structures lab will include a 12-metre-high (39-foot) facility for large-scale experiments and structural testing. The province says the high ceilings are important for fields like civil engineering, where the extra space is needed for building-science research and material studies.
The high bay research and structures lab will also include industrial equipment such as two 10-tonne gantry cranes, which can be used to move full-size structures for testing.
A rendering of the high bay research and structures lab building at UVic is shown: (Province of B.C. / Flickr)
A rendering of the high bay research and structures lab building at UVic is shown: (Province of B.C. / Flickr)
"Our government and UVic are responding to a clear demand for engineering and computer science programs, allowing people to learn where they live, while also welcoming new people to our community by providing increased capacity in these programs," said Murray Rankin, MLA for Oak Bay-Gordon Head in a release Thursday.
"This expansion will make it easier for people to access the training they need to be successful in their fields and for our community and province to benefit," he said.
The province says that the 500-seat expansion at UVic is part of the government's plan to add 2,900 tech-related seats across B.C. by 2023.
The province adds that the two new buildings are designed to meet a net-zero carbon target and will include green technologies such as solar roofs, heat pumps and rain gardens.
The project is estimated to cost $89.6 million, with the province funding $64.8 million and UVic contributing $24.8 million through a fundraising campaign.
Construction is slated to begin in early 2022 and the buildings are expected open in 2024.
"This new space will accelerate UVic’s research discoveries and attract top-tier international scholars and researchers," said Mina Hoorfar, dean of the UVic Faculty of Engineering and Computer Science in a statement.
"These landmark buildings will provide a dynamic environment for the training of future engineers and computer scientists," she said. "We plan to strengthen Victoria as technology hub by attracting more top talent to UVic and helping position this region as a global centre of excellence."
CTVNews.ca Top Stories
'I just can't believe that it took so long': Body found in wreckage 3 months after deadly fire
A man accused of arson in a January Old Strathcona apartment fire is expected to be charged with manslaughter after a body was discovered in the burned building late last month.
No proof man lied to brother about number of kittens born in litter, B.C. tribunal rules
A man was denied a $5,000 payout from his brother after a B.C. tribunal dismissed his claim disputing how many kittens were born in a litter.
Quebec police hand out hundreds of tickets to Hells Angels and other bikers before 'first run' meeting
Quebec provincial police handed out hundreds of fines to Hells Angels members and other supporting motorcycle clubs who met for their 'first run' in a small town near Sherbrooke, Que.
Explosion at train station leads to discovery of stolen car on Montreal's South Shore: police
Police are investigating after a BMW exploded in the St-Lambert Exo train station parking lot on Montreal's South Shore.
A Chinese driver is praised for helping reduce casualties in a highway collapse that killed 48
A Chinese truck driver was praised in local media Saturday for parking his vehicle across a highway and preventing more cars from tumbling down a slope after a section of the road in the country's mountainous south collapsed and killed at least 48 people.
Snakes almost on a plane: U.S. TSA discovers a bag with small snakes in passenger's pants
According to an X post by the Transportation Security Administration, officers at the Miami International Airport found the small bag of snakes hidden in a passenger's trousers on April 26 at a checkpoint.
Russia puts Ukrainian President Zelenskyy on its wanted list
Russia has put Ukrainian President Volodymyr Zelenskyy on its wanted list, Russian state media reported Saturday, citing the interior ministry’s database.
A candidate for Germany's key party was beaten up while campaigning for European elections
A candidate for Chancellor Olaf Scholz's center-left party in next month's election for the European Parliament was beaten up and seriously injured while campaigning in an eastern city, the party said Saturday.
Grandparents killed in wrong-way crash on Hwy. 401 identified
A 60-year-old man and a 55-year-old woman killed in a wrong-way crash on Highway 401 earlier this week have been identified by the Consulate General of India in Toronto.