Atlantic

N.S. met duty to consult with first nation on Alton Gas project: minister

Published

An unidentified man stands at a Mi'kmaq camp at the entrance to an Alton Gas work site along the Shubenacadie River, in Fort Ellis, N.S. on Monday, March 18, 2019. (THE CANADIAN PRESS/Andrew Vaughan)